AL-HARAM MASSA PROJECT (P-1)
PROJECT DETAILS
Project ID: [25858] | |
Country: | Saudi Arabia |
City: | Jeddah |
Year: | 2007 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 1086 m |
Nominal Diameter DN: | 250 | 800 mm |
Contractor: | ACTIVE WATER PROJECT (ECO WATER) SY |