Adutora Monte Alto
PROJECT DETAILS
Project ID: [26814] | |
Country: | Brazil |
City: | Sao Paulo |
Year: | 2006 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 2088 m |
Nominal Diameter DN: | 400 | 400 mm |
Nominal Pressure PN: | 10 | 10 bar |
Nominal Stiffness SN: | 5000 | 5000 N/m2 |
Client: | SABESP Lins |