Aaselva kraftverk
PROJECT DETAILS
Project ID: [22196] | |
Country: | Norway |
City: | Jolster |
Year: | 2010 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 1260 m |
Nominal Diameter DN: | 800 | 800 mm |
Nominal Pressure PN: | 6 | 25 bar |
Nominal Stiffness SN: | 5000 | 5000 N/m2 |
Consultant: | Ing. Hermod Seim |
Client: | Aaselva kraft AS |