4500824659/G.006637 SPL P1:Rijbaan A thv VOP F9
.
More information about this application
PROJECT DETAILS
Project ID: [34875] | |
Country: | Netherlands |
City: | Schiphol |
Year: | 2018 |
Application: | Drainage |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 216 m |
Nominal Diameter DN: | 400 | 500 | 860 | 1280 mm |
Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
Nominal Stiffness SN: | 16000 | 16000 | 16000 | 16000 N/m2 |
Consultant: | Arcadis/ Heijmans |
Contractor: | Heijmans Infra BV |
Client: | Schiphol Airport |