Link | Country | Year | Total Length [m] | Nominal Diameter DN [mm] | Nominal Pressure PN [bar] | Nominal Stiffness SN [N/m2] | Technology | |
---|---|---|---|---|---|---|---|---|
Bevško sewer | Slovenia | 2018 | 306 | 300 | 400 | 1 | 10000 | Hobas | |
Microtunneling Vodice | Slovenia | 2018 | 105 | 500 | 1 | 200000 | Hobas | |
Lidl Arja vas Celje | Slovenia | 2018 | 3413 | 150 | 200 | 250 | 300 | 1 | 10000 | Hobas | |
Ajdovščina WWTP | Slovenia | 2018 | 30 | 1200 | 1 | 10000 | Hobas | |
Cooling water system by Amiblu for thermoelectric plants in Bolivia | Bolivia | 2018-2019 | approx. 3510 | 700 | 1000 | 25 | 250 | 16 | 2500 | Flowtite | |
Flowtite GRP pipes boost hydropower plant Porąbka | Poland | 2017-2018 | 92 | 3300 | 1000 | 250 | 6 | 5000 | Flowtite | |
High-performance double sewer line with Hobas GRP | France | 2018-2019 | 105 | 800 | 1434 | 1026 | 1 | 10000 | Hobas | |
Jacking under railway track with Amiblu GRP pipes | Germany | 2017 | 30 | 1280 | Flowtite | |||
GRP pipes and shafts by Amiblu excel big time in small space | Germany | 2018 | 125 | 2300 | 1 | 10000 | Flowtite | |
Hobas PU line pipes for flood prevention at the Danube, Austria | Austria | 2018-2019 | 300 | 2400 | 2 | 10000 | Hobas | |
Flowtite irrigation pipes make water flow upwards in Toledo, Spain | Spain | 2018-2019 | 7500 | 1600 | 10 | 6 | 5000 | Flowtite | |
Amiblu non-circular pipe solution for surcharged sewer | Germany | 2018 | 70 | Amiblu | ||||
Wastewater Treatment Plant (WWTP) Vidin | Bulgaria | 2018 | 444 | 500 | 600 | 700 | 800 | 1 | 10000 | 15000 | Hobas | |
Philip Kutev Str. | Bulgaria | 2018 | 421 | 1800 | 1 | 10000 | Hobas | |
Gudåa kraftverk | Norway | 2018 | 269 | 900 | 16 | 20 | 5000 | Flowtite | |
Myrholten kraftverk | Norway | 2018 | 1587 | 700 | 900 | 6 | 10 | 16 | 5000 | Flowtite | |
Skeidsflåten kraftverk | Norway | 2018 | 2514 | 1600 | 1800 | 6 | 10 | 16 | 5000 | Flowtite | |
Øvre og Nedre Leiråga kraftverk | Norway | 2018 | 2306 | 1400 | 1600 | 1800 | 2000 | 6 | 10 | 16 | 25 | 5000 | Flowtite | |
Caorach Hydro | Scotland | 2018 | 2514 | 900 | 10 | 16 | 20 | 25 | 10000 | Flowtite | |
Bakkeelva kraftverk | Norway | 2018 | 1131 | 800 | 6 | 10 | 16 | 20 | 5000 | Flowtite | |
First CSO chamber on Austrian soil successfully installed | Austria | 2018 | 10 | 1200 | 900 | 800 | 600 | 1 | 10000 | Amiblu Hobas | |
Record sewer jacking with Flowtite pipes in Poznań | Poland | 2016-2018 | 4118 (jacking) 706 (open trench) | 1499 | 1720 | 850 | 1400 | 1 | 10 | 32000 | 80000 | 50000 | 10000 | Flowtite | |
GRP Cooling water system for power plant Opole | Poland | 2015-2016 | 5730 | 3400 | 300 | 1200 | 10 | 10000 | Flowtite | |
GRP Cooling water system for power plant Jaworzno | Poland | 2017-2018 | 5000 | 3600 | 2400 | 1800 | 10 | 10000 | Flowtite | |
NC relining in L.A. with GRP pipes made in Poland | United States of America | 2018 | 3660 | Flowtite | ||||
Pipe jacking under Dutch highway | Netherlands | 2018 | 150 | 1280 | 160000 | Hobas | ||
Kite-shaped GRP upgrade for Wilhelmshaven’s city sewer | Germany | 2017 | 320 | 1500 | 10000 | Flowtite | ||
XL Hobas GRP storage tank installed in Austria | Austria | 2018 | 880 | 3000 | 1000 | 200 | Hobas | |||
Optimum solids retention with 190 m² Amiscreen | Germany | 2018 | 600 | Flowtite | ||||
Stormwater retention with Hobas pipes in hilly Netherlands | Netherlands | 2018 | 154 | 2200 | 3000 | Hobas |