Technology

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Wastewater gravity sewer Greven (Ausbau Lindenstrasse) Germany 2008 60 400 | 500 | 700 1 10000 Hobas
Wastewater gravity sewer Göttingen (Holtenser Landstraße) Germany 2008 114 600 1 10000 Hobas
Wastewater gravity sewer Gößnitz Germany 2008 126 700 1 10000 Hobas
Wastewater gravity sewer Gettorf Germany 2008 135 600 | 900 | 2000 | 2400 1 10000 | 20000 Hobas
Wastewater gravity sewer Emsdetten (Friedenstrasse) Germany 2008 264 400 1 10000 Hobas
Wastewater gravity sewer Dresden (Aspichteich) Germany 2008 30 250 | 600 1 10000 | 16000 Hobas
Wastewater gravity sewer Dortmund (Kläranlage Deusen) Germany 2008 12 1400 1 10000 Hobas
Wastewater gravity sewer Dortmund (Beurstraße/ Hüttemannstraße) Germany 2008 60 500 1 10000 Hobas
Wastewater gravity sewer Dissen (Maiberger Siel) Germany 2008 32 800 | 1000 6 5000 Hobas
Wastewater gravity sewer Buxheim Germany 2008 450 150 | 200 | 250 | 300 1 10000 Hobas
Wastewater gravity sewer Bierbergen Germany 2008 144 800 1 10000 Hobas
Wastewater gravity sewer Appenrode-Woffleben Germany 2008 443 200 1 10000 Hobas
Wastewater gravity sewer Anklam Germany 2008 96 500 1 10000 Hobas
Wastewater gravity sewer Sarajevo Bosnia and Herzegovina 2008 1188 1200 1 10000 Hobas
Motorway Bridge Drainage at A4 Sośnica – Gorzyczki with more than 1000 Pipeline Fittings Poland 2008 1400 150 | 500 1 | 1 5000 | 10000 Hobas
Record Sliplining Pipeline in Illinois, US United States of America 2008 2100 2555 | 3000 1 5000 Hobas
As long as the Yangtze wastewater pipeline China 2008 12612 800 | 2000 1 15000 Hobas
Hydropower Pipline for VOEST /VAEE in Zeltweg Austria 2008 2997 2400 1 | 6 5000 Hobas
Efficient Relining with HOBAS NC Line Netherlands 2008 860 Non-Circular 1 10000 Hobas
Hydropower Station in Norway Received a Durable HOBAS Penstock Norway 2008 114 2555 6 5000 Hobas
Wastewater Pipes Transporting Silt and Stones in West Romania Romania 2008 70 1800 6 10000 Hobas
Airport Drainage System for International Airport Sarajevo Bosnia and Herzegovina 2008 1200 1200 1 5000 Hobas
Wasteater Pipline to WWTP for a Blue Danube Hungary 2008 2000 1200 | 1400 | 1800 1 | 6 5000 Hobas
HOBAS Pipes for the ski destination in Utah United States of America 2008 1219 1200 | 2000 1 5000 Hobas
GRP Pipe as Protection Pipe for LNG Pipeline at Isle of Grain power station United Kingdom 2008 522 2160 1 32000 Hobas
Economic Microtunneling with HOBAS Jacking Pipes in Krakow Poland 2008 6500 500 | 1100 | 1200 1 | 6 2500 | 20000 Hobas
Raw Water Pipeline and Discharge from Pécs to Szekszár Hungary 2008 658 700 | 1200 1 | 6 10000 Hobas
Wastewater Disposal Pipeline installed by Microtunneling in Rome Italy 2008 320 1400 1 32000 Hobas
Relining Cooling Pipes at a Coal-Fired Cogeneration Energy Plant in Bremen Germany 2008 200 900 | 1200 6 10000 Hobas
GRP Pipes to withstand heavy truck traffic loads in Pécs Hungary 2008 596 300 | 1200 1 5000 Hobas