Link Country Year Total Length [m] Nominal Diameter DN [mm] Nominal Pressure PN [bar] Nominal Stiffness SN [N/m2] Technology PDF
Cooling water system by Amiblu for thermoelectric plants in Bolivia Bolivia 2018-2019 approx. 3510 700 | 1000 | 25 | 250 16 2500 Flowtite
Flowtite GRP pipes boost hydropower plant Porąbka Poland 2017-2018 92 3300 | 1000 | 250 6 5000 Flowtite
High-performance double sewer line with Hobas GRP France 2018-2019 105 800 | 1434 | 1026 1 10000 Hobas
Jacking under railway track with Amiblu GRP pipes Germany 2017 30 1280 Flowtite
GRP pipes and shafts by Amiblu excel big time in small space Germany 2018 125 2300 1 10000 Flowtite
Hobas PU line pipes for flood prevention at the Danube, Austria Austria 2018-2019 300 2400 2 10000 Hobas
Flowtite irrigation pipes make water flow upwards in Toledo, Spain Spain 2018-2019 7500 1600 10 | 6 5000 Flowtite
Amiblu non-circular pipe solution for surcharged sewer Germany 2018 70 Amiblu
Wastewater Treatment Plant (WWTP) Vidin Bulgaria 2018 444 500 | 600 | 700 | 800 1 10000 | 15000 Hobas
Philip Kutev Str. Bulgaria 2018 421 1800 1 10000 Hobas
Gudåa kraftverk Norway 2018 269 900 16 | 20 5000 Flowtite
Myrholten kraftverk Norway 2018 1587 700 | 900 6 | 10 | 16 5000 Flowtite
Skeidsflåten kraftverk Norway 2018 2514 1600 | 1800 6 | 10 | 16 5000 Flowtite
Øvre og Nedre Leiråga kraftverk Norway 2018 2306 1400 | 1600 | 1800 | 2000 6 | 10 | 16 | 25 5000 Flowtite
Caorach Hydro Scotland 2018 2514 900 10 | 16 | 20 | 25 10000 Flowtite
Bakkeelva kraftverk Norway 2018 1131 800 6 | 10 | 16 | 20 5000 Flowtite
First CSO chamber on Austrian soil successfully installed Austria 2018 10 1200 | 900 | 800 | 600 1 10000 Amiblu Hobas
Record sewer jacking with Flowtite pipes in Poznań Poland 2016-2018 4118 (jacking) 706 (open trench) 1499 | 1720 | 850 | 1400 1 | 10 32000 | 80000 | 50000 | 10000 Flowtite
GRP Cooling water system for power plant Opole Poland 2015-2016 730 3400 10 10000 Flowtite
GRP Cooling water system for power plant Jaworzno Poland 2017-2018 5000 3600 | 2400 | 1800 10 10000 Flowtite
NC relining in L.A. with GRP pipes made in Poland United States of America 2018 3660 Flowtite
Pipe jacking under Dutch highway Netherlands 2018 150 1280 160000 Hobas
Kite-shaped GRP upgrade for Wilhelmshaven’s city sewer Germany 2017 320 1500 10000 Flowtite
XL Hobas GRP storage tank installed in Austria Austria 2018 880 3000 | 1000 | 200 Hobas
Optimum solids retention with 190 m² Amiscreen Germany 2018 600 Flowtite
Stormwater retention with Hobas pipes in hilly Netherlands Netherlands 2018 154 2200 | 3000 Hobas
Turning ocean into drinking water with Amiblu GRP Mexico 2017-2018 12270 500 | 1000 10 5000 Flowtite
Amiblu GRP penstock for hydropower plant in Uganda Uganda 2017-2018 880 2100 | 2200 12 | 10 Flowtite
30 km pressure pipes for irrigation project in Algeria Algeria 2018 30000 600 | 1200 6 | 16 Flowtite
GRP sewer pipes installed in Luxembourgian nature reserve Luxembourg 2018 1280 1200 Flowtite