Flowtite

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
ul. Zagórskiego Poland 2008 114 600 | 600 1 | 1 10000 | 10000 Flowtite
Lotnisko – kanalizacja deszczowa Poland 2008 1178 400 | 1200 Flowtite
ul. Drewniana Poland 2008 38 700 | 700 Flowtite
Generalnyj Kolektor Russia 2008 377 300 | 700 1 | 1 10000 | 20000 Flowtite
Vodoley Russia 2008 354 900 | 900 10 | 10 10000 | 10000 Flowtite
Colector Solares 1era. Etapa Mexico 2008 248 1900 | 1900 1 | 1 2500 | 2500 Flowtite
Planta de Tratamiento Reynosa Mexico 2008 1358 450 | 1500 1 | 1 2500 | 2500 Flowtite
Conducción Poligono Paraiso Mexico 2008 10632 600 | 1000 2500 | 2500 Flowtite
Acueducto La Antigua Mexico 2008 2500 750 | 750 10 | 10 2500 | 2500 Flowtite
Colector Poligono Paraiso Mexico 2008 2657 600 | 1600 1 | 1 2500 | 2500 Flowtite
Carcamo Lerma Mexico 2008 210 800 | 800 1 | 1 2500 | 2500 Flowtite
Emisor Reynosa Mexico 2008 213 900 | 1500 1 | 1 2500 | 2500 Flowtite
Planta de Tratamiento Lerdo Mexico 2008 283 600 | 800 1 | 1 2500 | 2500 Flowtite
ETAR ALVERCA Portugal 2008 1812 1600 | 1600 6 | 6 5000 | 5000 Flowtite
Campigo, Irrigation Pipeline Italy 2008 7834 1000 | 1000 10 | 10 10000 | 10000 Flowtite
Brenta-Cittadella, Irrigation Pipeline Italy 2008 12144 350 | 700 10 | 10 10000 | 10000 Flowtite
POTABLE & FIREWATER WATER DIST SYST Saudi Arabia 2008 4644 200 | 400 Flowtite
POTABLE & FIREWATER WATER DIST SYST Saudi Arabia 2008 3156 100 | 150 Flowtite
AL AREEN INFRASTRUCTURE PROJECT Bahrain 2008 Flowtite
DURRAT AL BAHRAIN PROJECT Bahrain 2008 408 150 | 250 Flowtite
IRRIGATION LAKE INTAKE AND INLET Bahrain 2008 Flowtite
INFRASTRUCTURE MAINLAND ‘A’ -DURRAT Bahrain 2008 3762 150 | 350 Flowtite
INFRASTRUCTURE MAINLAND ‘A’ -DURRAT Bahrain 2008 Flowtite
IRRIGATION LAKE INTAKE AND INLET Bahrain 2008 Flowtite
INFRASTRUCTURE MAINLAND ‘A’ -DURRAT Bahrain 2008 756 150 | 150 Flowtite
SUPPLY OF D.I.PIPES AND Bahrain 2008 Flowtite
354M- GASCO RUWAIS 4TH NGL PLANT Bahrain 2008 Flowtite
WDD TENDER No. 496/27/52-PM Bahrain 2008 82506 150 | 600 Flowtite
HIDD PORT INFRASTRUCTURE PROJECT Bahrain 2008 Flowtite
WDD-8-28-SUPPLY OF D.I. Bahrain 2008 Flowtite